小站备考
托福
托福听力
Delta 听力

红DeltaTest6听力Technical Requirements for Murals原文文本答案解析+音频录音mp3

展开
Tip:单击查看句义;划选/双击查生词

[00:00.00]W1: I know you’re all excited about our class project.[00:04.00] But before we get started on the design of our mural, let’s review some of the technical requirements for murals. [00:10.66]What factors do we need to keep in mind? Yes, Lydia?
[00:15.36]W2: The mural has to be permanent. [00:17.06]It has to last as long as the building. [00:19.26]And it has to be sturdy enough to put up with conditions like the walls being washed.
[00:23.16]W1: Good points. Yes, David?
[00:25.16]M: It should have a flat finish so you can look at it from all angles without seeing any glare.[00:29.86] And the design should be laid out so you can see it while you’re walking rather than standing still.
[00:34.66]W1: Yes, those are all things we need to bear in mind. [00:37.96]We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. [00:47.06]And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. [00:54.46]The term “mural” implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. [01:03.46]A mural is an integral part of the building. [01:06.66]If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. [01:18.46]Now, what are some of the technical requirements for our wall?
[01:22.36]M: Obviously, the wall shouldn’t move.[01:24.66] It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
[01:29.36]W1: Yes, it’s vital that our wall be perfectly immovable. [01:33.26]And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. [01:44.66]Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. [01:53.46]When water leaks through a wall, it may dissolve the salts that are in the building materials. [01:59.06]When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster.[02:07.26]This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
[02:14.66]W2: Can moisture make the paint peel off?[02:16.66]W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. [02:28.16]And we don’t want that happening to our , work, so we’ll need to take measures to prevent it.[02:33.46] Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface.[02:40.86]So our first rule is to exclude dampness as much as possible.
[02:46.26]M: Don’t we also need to guard the plaster from extreme changes in temperature?
[02:50.16]W1: Yes. So, how are we going to do this?
[02:52.86]M: We could create an air space between the outer wall of the building and the plaster.[02:57.86]We could do this by building a screen or, um, like a false wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. [03:08.46]There’d be like an inch of air space between the false wall and the exterior wall. [03:13.06]The air space would have an insulating effect. [03:15.86]What I mean is, it would slow down any temperature changes on the plaster.
[03:20.46]W1: Yes, you’re correct about the insulating effect of an air space.[03:25.46]Now, to do this—it’s called “furring” the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. [03:36.56]The furring of the wall creates an air space of one-half to one inch between the outer and inner walls.[03:44.16] That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.

1.Why is the class discussing the technical requirements of murals?

你的答案:
正确答案:D
题目解析:
 后才能查看题目解析,还没有账号? 马上注册
这堂课将创作自己的壁画。 指导员说I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals.

学习页面

Medi

terr

anean

加强 + 政府 + 名词后缀

加强的政府——管理

原文例句

加入生词

本文生词 0

色块区域是你收藏过的生词;

查询次数越多,颜色越深哦~

显示文中生词

登录后才能收藏生词哦,现在登录注册>

本文重点词 45

文中加粗单词为本文重点词;

根据词频与核心词范围精心挑选,托福考试必掌握词汇。

显示文中重点词
学习本文词汇

文中划选/双击的生词、加粗重点词已收纳至词盒

可随时点击词盒查看哦~

只有在词句精学模式下才能开启词盒功能哦~

我知道了

词盒
收藏
笔记
我的笔记
5000
保存
反馈